MY41 Explorer underway

Current builds

Every hull, in build.

Build progress for each Magnolia hull, by series and stage. Photographs will be added when they are ready.

The hulls

Where each boat stands.

Every hull in the three series. Delivery positions are discussed directly with Magnolia.

HullSeriesStageDeliveryStatus
MY4101MY41 ExplorerFinal year of constructionWindow Q4 2026 / Q1 2027Available
MY4102MY41 ExplorerKeel laidSet at contractAvailable
MY4103MY41 ExplorerKeel laidFollows MY4102Available
MY2801MY28 ExplorerUnder construction2028Sold
MY2802MY28 ExplorerUnder constructionQ1 2029Sold
MY2803MY28 ExplorerPre-productionOn requestAvailable
MY2804MY28 ExplorerPre-productionOn requestAvailable
MY2401MY24 Neo ClassicDelivered 2022DeliveredSold

MY41 Explorer · MY4101

Final year of construction.

Q4 2026 / Q1 2027Delivery window

The delivery window is a commercial target and depends on interior completion and commissioning through the winter.

Walk through MY4101, deck by deck

Hull, machinery and running gear are done. What remains is interior, commissioning and sea trials on the Turkish coast.

As of the July 2026 progress report, the hull bottom is in top coat, propellers and twin rudders are installed, main engines, generators and switchboards are in place, wheelhouse consoles are templated and cabled, and painted panelling is going into the guest cabins. Superstructure top coat, interior installation and commissioning follow, then launch and sea trials ahead of handover.

The exterior is being brought to top coat with the final colors held open, so an incoming owner can still choose the scheme.

Done

Hull faired and painted below the waterline. Running gear complete. Main machinery, generators and switchboards installed. Insulation and cabling throughout.

In progress

Interior joinery on the guest and owner decks. Bridge systems integration. Superstructure paint. Ensuite and galley build-out.

To come

Superstructure top coat. Interior completion. Commissioning. Launch, sea trials, class and flag surveys, delivery.

Build photographs will be added when they are ready.

MY41 Explorer · MY4102 and MY4103

Keels laid.

The second and third MY41 hulls have their keels laid at Magnolia and follow MY4101 on the same line, to the same drawings and specification.

Both are available. Because they are earlier in the build, an owner has more room to shape the interior, finishes and colors before joinery begins. Build photographs will be published here as the hulls progress.

MY28 Explorer · MY2801 to MY2804

The second series.

MY2801 and MY2802 are sold and under construction: MY2801 delivers in 2028, MY2802 in Q1 2029. MY2803 and MY2804 are available, in pre-production.

  • MY2801Roamer. Sold. Under construction, delivery 2028
  • MY2802Sold · Delivery Q1 2029
  • MY2803Available. Pre-production; version chosen by the owner
  • MY2804Available. Pre-production; version chosen by the owner

Build photographs of the MY28 hulls will be published here as construction progresses.

MY2401 at anchor
Delivered MY2401

MY24 Neo Classic · MY2401

Delivered 2022.

Magnolia One, the first MY24 Neo Classic, was built entirely at the yard and delivered in 2022. She has since been sold.

Visit Magnolia

A boat that exists can be inspected.

Walk through MY4101 with the build team, by appointment.